The Challenge
Rapid commercial and residential expansion to the west and northwest of Bozeman required a major water system trunk line along North 19th Avenue, infrastructure that needed to be in place ahead of the growth it was built to serve. The project required right-of-way acquisition along portions of the alignment and careful coordination with existing commercial service connections.
Our Solution
Gaston Engineering & Surveying provided surveying, engineering design, and full construction management for the installation of 18" and 21" diameter ductile iron water main, including valves, fire hydrant assemblies, and all associated connections. Right-of-way acquisition was managed in parallel with design, keeping the project on schedule despite the added coordination requirements.