Bozeman Deaconess Hospital
Engineering Around a Fully Operational Hospital
Service: Land Surveying
The Challenge
The Bozeman Deaconess Hospital expansion involved the addition of a new hospital wing to service additional rooms and beds — all while maintaining uninterrupted service to a functioning hospital. Continuous patient access, operational water supply, and safe ingress and egress couldn't be compromised at any phase of construction.
Our Solution
Gaston Engineering & Surveying provided the land surveying during the design and construction phases to ensure the new addition coordinated seamlessly with the existing building. Tolerances were very tight and this required precision surveying and close coordination with the design and construction teams. The expansion was completed on schedule without a single interruption to hospital operations or patient services.